Rectifying Incorrect Terminations

Rectifying Incorrect Terminations

NWT Energy were invited to tender for a new 70kW solar PV installation by one of the UK’s leading property agents. The site already had two independent solar PV systems in place already, rated at 98kW and 22kW, which had been installed previously.

Find out more
Incorrect Inverter Setup

Incorrect Inverter Setup

Inverters are a key component of solar PV systems and also the most likely component to cause issues. As part of a new maintenance contract, NWT Energy were asked to inspect an existing 98kW system to identify any potential problems and rectify them.

Find out more
Agricultural Client, Ashford

Agricultural Client, Ashford

NWT Energy were contracted by an agricultural client in Ashford, to clean the solar PV system, as the original installer was no longer in business. Local environmental conditions require the modules to be cleaned regularly, to ensure they are operating effectively.

Find out more
Panel Maintenance Project, East Sussex

Panel Maintenance Project, East Sussex

NWT Energy are often asked to rectify issues with PV systems that we didn't install, frequently because the work was carried out incompetently or because the original installer has gone out of business. In this case, our preliminary visit highlighted several areas of concern.

Find out more
Dairy Farm, Haywards Heath, West Sussex

Dairy Farm, Haywards Heath, West Sussex

Holmbush Farm is a very successful dairy farm, in the heart of rural West Sussex. In November 2011, NWT Energy installed a 50kW solar PV system with REC 240PE panels on an Alumero mounting system with 2x PowerOne Trio inverters.

Find out more
UK Property Agent’s Site with Rodent Infestation

UK Property Agent’s Site with Rodent Infestation

NWT Energy was contracted by a leading UK property agent to perform maintenance inspections on a number of their sites. At one grain store there were substantial problems caused by not having the correct seals in place on the electrical cabinets.

Find out more
Waste Management Centre

Waste Management Centre

NWT Energy were contracted to clean the solar panels at one of the leading suppliers of waste management and recycling services in London and the South East. The exceptional soiling at this site was crippling the system's performance and creating further issues. It was clear to our experienced professionals that this site was unique and required an expert approach.

Find out more
High Chelmer Shopping Centre

High Chelmer Shopping Centre

NWT Energy were invited to inspect this solar PV installation on the roof of a shopping centre. The panels had been installed by a company now out of business, so our expertise was required to check the quality and oversee repair work.

Find out more
London City Bond

London City Bond

London City Bond has 250kW of solar PV spread across a vast area of difficult to reach, south-facing roof surfaces.

Find out more